Skip to content
X12 Inbound

Fiji Water / OTM X12 204 Motor Carrier Load Tender

X12 204 (Motor Carrier Load Tender) is the EDI transaction exchanged between Fiji Water / OTM and its trading partners. Stacksync handles full compliance, mapping, and real-time delivery.

Segments
28
Loops
6
X12 204
All partners ↗

Schema reference

28 segments · 6 loops · X12 204 Motor Carrier Load Tender

ISA

ISA Interchange Control Header

GS

GS Functional Group Header

ST

Transaction Set Header

B2

Beginning Segment for Shipment Information Transaction

B2A

Set Purpose

L11

Business Instructions and Reference Number

G62

Date/Time

MS3

Interline Information

AT5

Bill of Lading Handling Requirements

NTE

Note/Special Instruction

Loop
N1

Name

N3

Address Information

N4

Geographic Location

G61

Contact

Loop
N7

Equipment Details

MEA

Measurements

Loop
S5

Stop Off Details

L11

Business Instructions and Reference Number

G62

Date/Time

NTE

Note/Special Instruction

Loop
N1

Name

N3

Address Information

N4

Geographic Location

Loop
OID

Order Identification Detail

LAD

Lading Detail

Loop
L5

Description, Marks and Numbers

L3

Total Weight and Charges

SE

Transaction Set Trailer

Trading partners

3+ trading partners.
And every channel covered.

We connect to every major retailer, distributor, and 3PL on the EDI network. Type to search the directory, or browse the full catalogue.

Fiji Water / OTM EDI 204 FAQ

Common questions about 204 Motor Carrier Load Tender with Fiji Water / OTM.

What is X12 204 Motor Carrier Load Tender?
X12 204 (Motor Carrier Load Tender) is the EDI transaction set used to exchange motor carrier load tender data. Fiji Water / OTM requires it from trading partners.
Does Fiji Water / OTM require 204 for trading partners?
Yes — Fiji Water / OTM supports X12 204 Motor Carrier Load Tender. Stacksync handles the full integration so your team can focus on operations.
How fast can I integrate Fiji Water / OTM 204 with Stacksync?
Most companies go live with Fiji Water / OTM 204 on Stacksync in days. Pre-built mappings, no-code setup, and real-time monitoring make EDI compliance straightforward.

Ready to automate your Fiji Water / OTM EDI?

Most teams go live in days, not months. Talk to our team and we'll walk you through your specific setup.