Drawing-to-fabrication release
Route the controlled drawing through customer and technical approval before production and installation handoffs.
Explore workflows ↗Fencing fabrication and installation

Connect custom configurations, material requirements, shop release and field scope changes.
Sales revisions, drawings, stock units and field measurements reach production and finance at different times.
Explore your process in a demo, or get our shared two-way sync architecture guide.
The platform, in operating order
Keep shared customer, order, and operational records aligned, with clear field ownership.
Explore two-way sync 02Move approved work between systems, assign exceptions, and confirm the result.
Explore workflows 03Investigate cross-system questions, assemble the evidence, and prepare the next action.
Explore ai agents (genies) 04Connect trading-partner documents to operational records and exception handling.
Explore ediBuilt around your operations
US commercial fencing and gate businesses with 100–1,000 employees that fabricate or supply materials and install projects.
Route the controlled drawing through customer and technical approval before production and installation handoffs.
Explore workflows ↗Reconcile lengths, gate counts and approved pricing without losing removed or relocated scope.
Explore workflows ↗Compare supplier lines, units and terms against the released material list, with explicit gaps.
Explore Genies ↗Your systems and records
| Record | Owner | Operating rule |
|---|---|---|
| Configuration revision | Sales and technical owners | Distinguish proposal from approved fabrication scope. |
| Material requirement | Production or estimating | Preserve specification, dimensions and units. |
| Confirmed allocation | Inventory owner | Separate planning requests from accepted stock commitments. |
| Field scope change | Project and commercial owners | Track measured additions and removals against the approved baseline. |
Steel and fencing supplier EDI that preserves bundles, pieces, lengths and product-specific conversion rules.
Evaluate your next process
Connect approved gate and fence configurations to the right order and project revision.
Connect material commitments, fabrication progress and installation staging with clear ownership.
Route drawing revisions, production release and site readiness through the right decisions.
Compare fencing supplier offers against the approved material requirement with explicit specification and commercial gaps.
Implementation and operating guides
Keep approved fence and gate configurations linked to the correct NetSuite order revision.
Show fence-material commitments by job without treating a shared planning board as an inventory reservation engine.
Connect fencing sales contacts to the right site, customer and project without confusing access with purchasing authority.
Coordinate custom-gate drawing approval, production release and installation scheduling through separate controlled decisions.
Turn fencing field changes into reviewed quantities and billable revisions without losing measurement or approval evidence.
Use a Genie to compare fencing supplier quotes against approved material requirements with visible unit and specification differences.
Resolve the specification and commercial gaps that make fencing supplier quotes incomparable.
Map fencing material EDI quantities and units to project purchase lines without losing package or specification context.
No. Confirm the material specification and the inventory owner's accepted allocation for the job.
They can prepare a comparison from verified inputs. Qualified reviewers establish conformity, and the buyer accepts commercial terms.
Treat postrelease changes as reviewed revisions with work-in-progress context.
Bring one real process
Bring the systems, record types, and exceptions your team handles today. We’ll scope the connections and actions, then walk through the path to a confirmed result.
Explore your process in a demo, or get our shared two-way sync architecture guide.