Skip to content
Business productivity

Smartsheet to Wrike integration — real-time, two-way sync

Keep Smartsheet and Wrike in sync without custom scripts. Cut weeks of integration work, eliminate silent data drift, and give your team a single, reliable source of truth.

  • SOC 2 and 6 other compliance frameworks
  • POC with real engineers in minutes

Adopted by fast-scaling companies moving mission-critical data in real time

Case study
Migrated from MuleSoft
Case study
Migrated from Celigo
Migrated from Heroku Connect
Migrated from Matillion
Case study
Migrated from Fivetran
Case study
Migrated from Celigo
Why teams connect Smartsheet and Wrike

Stop re-entering the same information in Smartsheet and Wrike: Stacksync keeps the records they share consistent in real time, in both directions.

Two tools in the daily stack often hold overlapping information: the same people, the same companies, or the same pieces of work, described twice. The tools do different jobs, so consolidating is not the answer; the overlap just needs to stop drifting.

Stacksync syncs Reports, Attachments, Discussions and Comments, Users and Groups in Smartsheet with Workflows, Spaces, Tasks, Folders & Projects in Wrike in real time. You choose which records overlap, map the fields that should match, and pick a direction or let changes flow both ways. From then on, an update made in either tool is reflected in the other within seconds, without exports or copy-paste.

Because the sync is field-level, each tool keeps its own extras; only the shared data is held in agreement.

Common use cases

  • 01 Two-way sync a project-tracker Sheet's Rows with a Postgres table so engineering works in SQL while project managers stay in Smartsheet.
  • 02 Write records from a CRM or ERP into Smartsheet Rows so ops teams manage intake and status in a grid, then push status Cells back to the source.
  • 03 Two-way sync of Tasks and their Custom Fields between a Wrike project and Postgres so ops teams work in SQL while project owners stay in Wrike.
  • 04 Write closed deals or new orders from a CRM or ERP into Wrike Tasks to launch delivery, onboarding, or fulfillment projects automatically.

Common sync patterns

Handoffs between teams

When work started in one tool continues in the other, the shared fields travel with it automatically.

Where both tools track people or companies: one consistent record

Contact and company details corrected in either tool update the other, so nobody works from the old version.

Where one tool produces events: mirror them in the other

Payments, replies, messages, or tickets created in one tool can create or update matching records in the other, keeping context in one place.

What you can sync between Smartsheet and Wrike

Representative objects on each side — any object or custom field can map to any target. Schemas are auto-detected; types are converted between the two systems.

Smartsheet objects Wrike objects How this pairing syncs
Users and Groups Account membership and sharing; synced to keep an HR or identity source aligned with sheet and workspace access. Spaces Top-level containers that hold Folders, Projects, and their members; used to scope which Folders a given sync covers. Users and Groups is specific to Smartsheet and Spaces to Wrike — each maps to any object or custom field on the other side.
Sheets The core container; each sheet has typed columns, rows, and a modifiedAt stamp. Stacksync treats a sheet as a table and syncs its rows two-way. Tasks The primary unit of work and main record; created, updated, completed, and deleted via the REST v4 API and synced two-way. Subtasks are Tasks linked by superTask/subTask references. Sheets is specific to Smartsheet and Tasks to Wrike — each maps to any object or custom field on the other side.
Rows Records inside a sheet, each with createdAt/modifiedAt and cells keyed by columnId; the primary unit synced to and from external tables. Folders & Projects The container hierarchy: Folders group Tasks, and Projects add dates, an owner, and a status. Each maps to a synced table scope, and its structure defines what a sync covers. Rows is specific to Smartsheet and Folders & Projects to Wrike — each maps to any object or custom field on the other side.
Columns Define sheet schema and cell type (TEXT_NUMBER, DATE, CONTACT_LIST, PICKLIST, CHECKBOX); read via the API so field mappings can be generated. Custom Fields Typed fields (Text, Numeric, Date, DropDown, Contacts, Checkbox) defined at account or space level; mapped to database columns, with values written by field ID. Columns is specific to Smartsheet and Custom Fields to Wrike — each maps to any object or custom field on the other side.
Cells Row-by-column values; writes must match the column type and no single cell can exceed 4,000 characters. Comments Discussion and activity entries attached to Tasks and Folders; read out for history and reporting or written back as comments. Cells is specific to Smartsheet and Comments to Wrike — each maps to any object or custom field on the other side.
Reports Read-only roll-ups spanning multiple sheets; pulled into a warehouse for cross-sheet reporting, capped at 50,000 rows. Timelogs Time-tracking entries logged against Tasks; read for billing and utilization reporting or written back when hours are recorded elsewhere. Reports is specific to Smartsheet and Timelogs to Wrike — each maps to any object or custom field on the other side.

How changes propagate between Smartsheet and Wrike

Each direction of the sync is driven by what the source system can signal and what the destination accepts — detection, delivery, and expected latency below.

Smartsheet Wrike Sub-second propagation

DetectionSmartsheet notifies Stacksync of record changes through webhook events. Sheet-scoped webhooks subscribed to *.* events notify on row and cell changes.

DeliveryEach detected change is written to Wrike through its API, with automatic retries and rate-limit backoff.

Wrike Smartsheet Sub-second propagation

DetectionWrike notifies Stacksync of record changes through webhook events. Webhooks scoped to a folder, a space, or the whole account fire on events like TaskCreated, TaskStatusChanged, and FolderCreated, with event.

DeliveryEach detected change is written to Smartsheet through its API, with automatic retries and rate-limit backoff.

Rate-limit considerations

  • Smartsheet: 300 requests per minute per access token; heavy calls like posting attachments cost 10x (30/min). A 429 returns errorCode 4003, back off ~60s.
  • Wrike: Approximately 400 requests/minute per user (estimated on a per-second basis) with a higher per-IP ceiling; exceeding the limit or tripping Wrike's internal overload protection returns HTTP 429, handled with exponential backoff.
What ships with Smartsheet ⇄ Wrike

Connect Smartsheet and Wrike for flexible, real-time data sync.

Real-time sync, workflow automation, event queues, EDI, and monitoring, for every Smartsheet–Wrike connection.

Real-time

Two-way sync

Changes in Smartsheet or Wrike instantly reflect in both systems. No stale data, no manual imports.

No-code + pro-code

Workflow automation

Trigger automated workflows whenever Smartsheet or Wrike data changes, update records, fire webhooks, or kick off sequences without brittle API scripts.

At scale

Event queues

Handle millions of events per minute without losing a single Smartsheet or Wrike record.

Observability

Monitoring

Track your Smartsheet ⇄ Wrike sync health, view errors, and replay failed events in one click.

Trading partners

EDI

Transform legacy EDI complexity into simple database interactions between Smartsheet and Wrike.

How the Smartsheet and Wrike connectors work

Smartsheet

Integration surface
REST API (v2.0)
Authentication
OAuth 2.0 authorization-code flow, or a raw/personal API access token passed as a Bearer header
Change detection
Sheet-scoped webhooks subscribed to *.* events notify on row and cell changes; otherwise polling on sheet and row modifiedAt timestamps
Capabilities
read · write · webhooks
Rate limits
300 requests per minute per access token; heavy calls like posting attachments cost 10x (30/min). A 429 returns errorCode 4003, back off ~60s.

Wrike

Integration surface
REST API v4 (JSON), single account endpoint such as www.wrike.com/api/v4; the data-center host (US or EU) comes from the OAuth token response, plus REST-managed Webhooks
Authentication
OAuth 2.0 for multi-user apps (Authorization header carrying access_token and requested scopes), and a legacy Permanent Access Token for single-account and testing use
Change detection
Webhooks scoped to a folder, a space, or the whole account fire on events like TaskCreated, TaskStatusChanged, and FolderCreated, with event filtering and custom payload fields; polling the task updatedDate is the fallback
Capabilities
read · write · webhooks
Rate limits
Approximately 400 requests/minute per user (estimated on a per-second basis) with a higher per-IP ceiling; exceeding the limit or tripping Wrike's internal overload protection returns HTTP 429, handled with exponential backoff
Wrike setup guide
How it works

How to connect Smartsheet to Wrike — three steps, no code

Configure and sync within minutes, no code. Whether you sync 50k or 100M+ records, Stacksync handles the queues, infra, and plumbing. Integrations are non-invasive and need zero setup on your systems.

  1. 01

    Connect your apps

    Authenticate Smartsheet and Wrike with each platform's native method — OAuth, API keys, or service accounts — plus secure options like SSH tunneling, IP whitelisting, and VPC peering.

    • OAuth 2.0
    • SSH tunnel
    • VPC peering
    Smartsheet connected
    Wrike connected
    OAuth 2.0
    SSH tunnel
    SSL certificate
    VPC peering
  2. 02

    Choose tables

    Pick the Smartsheet and Wrike objects to sync — Stacksync auto-detects both schemas, including custom fields where the platform exposes them. Sync to existing tables, or let Stacksync create new ones with ideal data types.

    • Standard objects
    • Custom objects
    • Auto-schema
    objects · Smartsheet ⇄ Wrike
    Customers 12,480
    Sales Orders 8,213
    Invoices 5,902
    Items 1,344
  3. 03

    Map fields

    Fields map automatically even when names and types differ. Stacksync handles transformation and type casting for you, zero configuration required.

    • Auto-map
    • Type casting
    • Transforms
    Smartsheet Wrike
    Company company_name text
    Email email text
    Amount amount numeric
    Created created_at timestamp
FAQ

Smartsheet and Wrike integration FAQ

SECURITY

Security teams trust Stacksync

As a data company, we understand the importance of keeping your data secure. Stacksync is built with security best practices to keep your data safe at every layer, and is DPF-certified for US, EU, UK and CH data transfers.

SOC 2 Type II
ISO 27001
HIPAA BAA
GDPR
CCPA
CSA STAR
DPF US-EU-UK-CH
→ SECURITY WITH BENEFITS

SSO & SCIM

Let your users access Stacksync from your centralized user management systems. Works with Okta, Azure, Google SSO and more.

Alerts

Immediately get alerted about record syncing issues over email, Slack, PagerDuty and WhatsApp. Resolve issues from a centralized dashboard with retry and revert options.

Secure connection options

Securely connects to your systems with:

Related integrations

Every pair below is a real-time, two-way sync. Search all 516 integrations available for Smartsheet and Wrike.

Popular · 8 of 516
Coworkers laughing in front of a laptop in a casual office setting

Your last integration took months.
Your next one takes a prompt.