To start and identify an interchange of zero or more functional groups and interchange-related control segments
Granite City Electric X12 852 Product Activity Data
Plan X12 852 Product Activity Data for Granite City Electric (via Epicor Eclipse). Connect document identifiers to your business records, test exception handling and track each exchange to completion.
- Segments
- 9
- Loops
- 3
- X12 852
- Partner references ↗
Implementation guide
Granite City Electric (via Epicor Eclipse): 852 mapping and validation
X12 852 Product Activity Data is used when product sales or inventory activity is reported. Preserve item, location, activity type and reporting period so the product activity report in your business system stays connected to the original document.
This document is listed for Granite City Electric (via Epicor Eclipse). Confirm the version, required fields and responses that apply to your account.
| Document or decision | Record and matching IDs | What to test |
|---|---|---|
| Match the business record | product activity report item, location, activity type and reporting period |
|
| Update the receiving system | Processing the product activity report ID assigned by the receiving system and processing result |
|
| Check the processing result | Processing status for the product activity report Original document reference and matching response |
|
The document reference includes 9 segments. Use the segment reference below to locate the relevant parts of the message. Check required fields and repetition limits in the partner guide.
Implementation steps
-
Choose the starting event and owner
Decide which application acts when product sales or inventory activity is reported. Name the operational owner of the product activity report and the team that resolves rejected or ambiguous messages.
-
Keep record IDs connected
Map item, location, activity type and reporting period. Confirm qualifiers, code lists, units and date/time meaning against the agreed X12 version and Granite City Electric guide. Preserve the source reference alongside any new destination identifier.
-
Test failures before launch
Run the failure cases in the mapping table against realistic product activity report data. Check how the receiving system reports a rejection and how your team corrects it without creating a duplicate.
-
Track every document to completion
Record transport delivery and document validation separately from successful product activity report processing. Give unresolved errors an owner and check the receiving system before approving retries.
Go-live checklist
- An approved 852 sample and the agreed version and partner guide are available.
- The mapping tests pass with realistic product activity report data.
- Each submitted document can be traced through delivery, validation and processing in the receiving system.
- Your team knows how to investigate and recover a rejected or timed-out product activity report without processing it twice.
Transaction context
Where 852 Product Activity Data fits on Granite City Electric (via Epicor Eclipse)
- Granite City Electric channels
- 1 of 1
1 of Granite City Electric's 1 channel list 852
- Trading partners
- 33
partner references list 852
- Channels
- 38
channel entries list 852
The directory associates Epicor Eclipse and 852 with 1 channel.
Document structure
X12 852 Product Activity Data at the element level
The X12 852 reference contains 24 segment entries and 100 data elements; 46 are marked mandatory in this reference. Use the version and partner guide agreed for your account to confirm required fields.
- Segments
- 24
- Data elements
- 100
- Mandatory elements
- 46
| Segment | Elements | Mandatory |
|---|---|---|
| XQ | 3 | 2 |
| XPO | 4 | 1 |
| N9 | 2 | 1 |
| PER | 4 | 1 |
| N1 | 4 | 1 |
| N2 | 2 | 1 |
| N3 | 2 | 1 |
| FOB | 1 | 1 |
| DTM | 2 | 1 |
| LIN | 9 | 2 |
| AMT | 2 | 2 |
| ZA | 3 | 1 |
- Transaction Handling Code
- Date
- Purchase Order Number
- Reference Identification Qualifier
- Contact Function Code
- Entity Identifier Code
- Name
- Address Information
Segment reference — 9 segments 3 loops · X12 852 Product Activity Data
To indicate the beginning of a functional group and to provide control information
To indicate the start of a transaction set and to assign a control number
To specify reporting date and action to be taken
To identify a party by type of organization, name, and code
To specify basic item identification data
To provide activity details concerning product being reported
To transmit a hash total for a specific element in the transaction set
To indicate the end of the transaction set and provide the count of the transmitted segments (including the beginning (ST) and ending (SE) segments)
Related references
Other transactions in Granite City Electric (via Epicor Eclipse)
Other EDI documents listed on this channel.
Showing 9 of 9 references
Browse the full directoryGranite City Electric (via Epicor Eclipse) EDI 852 questions
Common questions about 852 Product Activity Data on the Granite City Electric (via Epicor Eclipse) channel.
What is X12 852 Product Activity Data used for?
852 is used when product sales or inventory activity is reported. It carries information for the product activity report. Match it to your business system using item, location, activity type and reporting period.
Is 852 required for Granite City Electric (via Epicor Eclipse)?
852 is listed for Granite City Electric (via Epicor Eclipse). Confirm the required version and direction for your business unit and account with the partner.
What should I map for X12 852?
Start with item, location, activity type and reporting period and the target product activity report. Define duplicate detection, allowed updates and response correlation before mapping individual fields. Use the partner guide to check required fields and their formats.
How should I test 852 error handling?
Keep sales, returns and stock movements in separate measures. Replace a corrected reporting period without counting the original activity twice. Also test a lost response after destination processing so that a retry cannot create an unintended duplicate or repeated adjustment.
How does 852 relate to other EDI messages?
Keep 852 business processing separate from transport receipt and technical validation. Agree which preceding record, response or reconciliation completes the product activity report workflow; confirm any required companion messages with your partner.
Connect Granite City Electric EDI to your business systems
See how Stacksync can fit your enterprise EDI workflow. Bring one partner guide and a sample exchange to plan the system mapping, exception handling and production rollout.




