Compare with final scope
Use approved substitutions and the governing project revision to identify the correct equipment evidence.
Solar installation and O&M services

Give a Genie the job of preparing a solar closeout packet from accessible project, equipment and completion records. It can identify missing serials, superseded documents and incomplete handover requirements. Project and technical owners validate the evidence before customer delivery or financial action.
The project is physically complete, but final equipment records and handover documents still describe different revisions.
Explore your process in a demo, or get our shared two-way sync architecture guide.
When this fits
US commercial solar installers and O&M providers with 100–1,000 employees that combine equipment supply, installation and service.
Use approved substitutions and the governing project revision to identify the correct equipment evidence.
Show where each device identifier came from and flag conflicts instead of inventing a complete asset list.
Assign gaps to the actual document or asset owner while preserving prepared, reviewed and delivered packet states.
The process, end to end
an installer completes a commercial rooftop project after a component substitution. The Genie finds closeout files for the superseded model and requests the correct evidence before the packet goes to the customer.
Scope your implementation
Review current platform pricing alongside the records, volume, and actions in your process. Use your own operating baseline to evaluate the economics.
Explore your process in a demo, or get our shared two-way sync architecture guide.
From foundation to action
Keep shared customer, order, and operational records aligned, with clear field ownership.
Explore two-way sync 02Move approved work between systems, assign exceptions, and confirm the result.
Explore workflows 03Investigate cross-system questions, assemble the evidence, and prepare the next action.
Explore ai agents (genies) 04Connect trading-partner documents to operational records and exception handling.
Explore ediGo deeper
Use Genies to prepare a solar project handover packet with traceable equipment and completion evidence.
Resolve solar closeout evidence conflicts before marking a customer handover packet complete.
Explore all solar installation and O&M services integration and automation guides ↗
No. It identifies the gap and requests authentic evidence from the responsible qualified team.
No. Ordered, received and installed states need separate evidence.
Measure reviewer corrections, missing-evidence resolution and the effort to assemble an accepted packet on your own projects.
It works best as the third step. A Genie assembling a closeout packet depends on project, equipment and completion records it can read, so two-way sync between HubSpot and NetSuite comes first to give it one approved scope and customer context. Workflows then route the equipment substitutions and O&M billing handoffs that produce the evidence. The Genie sits on top, comparing serials and handover documents with the final scope and preparing gaps for a project owner to resolve. EDI arrives last, for supplier shipment and receipt documents.