Skip to content

Stacksync × Supabase Miami: AI-Native OperationsOct 13Reserve your spot

X12 transaction code

EDI 862 Shipping Schedule (X12 862)

EDI 862 is the X12 Shipping Schedule transaction set, used when specific shipment timing or quantities are scheduled. The buyer, typically a manufacturing plant running just-in-time replenishment, sends the 862 to its supplier. The 830 forecast and 862 releases operate as a pair.

Standard
X12
Code
862
Partner references
3

At a glance

EDI 862 at a glance

What the 862 carries, who sends it to whom, when it goes out, and the segments trading partners list for it.

X12 862 Shipping Schedule summary
Document X12 862 Shipping Schedule
Business record Shipping schedule
Who sends it to whom The buyer, typically a manufacturing plant running just-in-time replenishment, sends the 862 to its supplier. The 830 forecast and 862 releases operate as a pair.
When it is sent Inventory of a component at the buyer's plant drops below its restock threshold, or the plant firms its short-term build plan, and the scheduling system releases an 862 to the supplier.
Match on Schedule reference, item and delivery time bucket
Partner references 3 trading partners in this directory
Related documents X12 830 Planning Schedule with Release Capability, X12 856 Ship Notice/Manifest

Key segments in an EDI 862

The business segments that appear in at least half of the 12 partner document references listed below, most common first. The table leaves out envelope segments (ISA, GS, ST, SE, GE, IEA). Your partner guide sets which segments and elements your account must send.

Segment Name Purpose Partner references
BSS Beginning Segment for Shipping Schedule To indicate the beginning of a shipping schedule. 12 of 12
N1 Name To identify a party by type of organization, name and code. 12 of 12
LIN Item Identification Detail To specify basic item identification data. 12 of 12
REF Reference Numbers To transmit identifying numbers. 12 of 12
CTT Transaction Totals To transmit a hash total for a specific element in the transaction set. 12 of 12
FST Forecast Schedule To specify the forecasted dates and quantities. 12 of 12
SHP Shipped/Received Information To specify shipment and/or receipt information. 12 of 12
N2 Additional Name Information To specify additional names or those longer than 35 characters in length. 11 of 12
N3 Address Information To specify the location of the named party. 11 of 12
N4 Geographic Location To specify the geographic place of the named party. 11 of 12

Stacksync connects EDI documents such as the X12 862 to your ERP, CRM and databases with two-way sync. Read the EDI overview, check pricing and security, or book a demo to walk through your partner guide.

Implementation guide

X12 862 mapping and validation

X12 862 Shipping Schedule is used when specific shipment timing or quantities are scheduled. Preserve schedule reference, item and delivery time bucket so the shipping schedule in your business system stays connected to the original document.

Use the version and implementation guide agreed with your trading partner to confirm required fields and responses.

Map records and test the business result
Document or decisionRecord and matching IDsWhat to test
Match the business record shipping schedule

schedule reference, item and delivery time bucket

  • Define which combination of schedule reference, item and delivery time bucket identifies one business record, its lines and any later revision.
Update the receiving system Processing the shipping schedule

ID assigned by the receiving system and processing result

  • Distinguish detailed shipping instructions from a longer-range forecast.
  • Apply a revised delivery bucket without retaining superseded demand as extra demand.
Check the processing result Processing status for the shipping schedule

Original document reference and matching response

  • Reconcile the shipping schedule with the source after a timeout before sending it again. A lost response can occur after the destination has already processed the document.

How the related documents differ

Each message represents a different business event. Use shared references to connect the records while tracking each message’s outcome separately.

Implementation steps

  1. Choose the starting event and owner

    Decide which application acts when specific shipment timing or quantities are scheduled. Name the operational owner of the shipping schedule and the team that resolves rejected or ambiguous messages.

  2. Keep record IDs connected

    Map schedule reference, item and delivery time bucket. Confirm qualifiers, code lists, units and date/time meaning against the agreed X12 version and partner guide. Preserve the source reference alongside any new destination identifier.

  3. Test failures before launch

    Run the failure cases in the mapping table against realistic shipping schedule data. Check how the receiving system reports a rejection and how your team corrects it without creating a duplicate.

  4. Track every document to completion

    Record transport delivery and document validation separately from successful shipping schedule processing. Give unresolved errors an owner and check the receiving system before approving retries.

Go-live checklist

  • An approved 862 sample and the agreed version and partner guide are available.
  • The mapping tests pass with realistic shipping schedule data.
  • Each submitted document can be traced through delivery, validation and processing in the receiving system.
  • Your team knows how to investigate and recover a rejected or timed-out shipping schedule without processing it twice.

Document structure

X12 862 Shipping Schedule at the element level

The X12 862 reference contains 22 segment entries and 74 data elements; 50 are marked mandatory in this reference. Use the version and partner guide agreed for your account to confirm required fields.

Segments
22
Data elements
74
Mandatory elements
50
Segments with elements marked mandatory in this reference
Segment Elements Mandatory
BSS 8 7
N1 3 1
LIN 4 2
REF 2 1
PER 4 1
FST 6 4
JIT 2 2
TD3 2 1
CTT 2 1
Key identifiers in 862
  • Transaction Set Purpose Code
  • Reference Number
  • Date
  • Forecast Type Qualifier
  • Forecast Quantity Qualifier
  • Entity Identifier Code
  • Product/Service ID Qualifier
  • Product/Service ID

Catalog breakdown

Where X12 862 Shipping Schedule appears in this catalog

The largest groups of classified 862 catalog entries are in agriculture, manufacturing & industrial and automotive.

By industry

  • agriculture 10 channels
  • manufacturing & industrial 1 channel
  • automotive 1 channel

By network

  • Saicits 1 channel
Partner entries with the most listed channels

FAQ

EDI 862 questions

What is an EDI 862?

EDI 862 is the X12 Shipping Schedule transaction set. Trading partners use it when specific shipment timing or quantities are scheduled. It carries the data for the shipping schedule, and your system matches it on schedule reference, item and delivery time bucket.

Who sends an EDI 862 and who receives it?

The buyer, typically a manufacturing plant running just-in-time replenishment, sends the 862 to its supplier. The 830 forecast and 862 releases operate as a pair. Your trading partner agreement confirms the direction and version for your account.

When is an EDI 862 sent?

Inventory of a component at the buyer's plant drops below its restock threshold, or the plant firms its short-term build plan, and the scheduling system releases an 862 to the supplier. Your partner guide sets any deadline or schedule for the document.

What are the key segments in an EDI 862?

Across 12 partner document references listed here, the business segments that appear most often include BSS (Beginning Segment for Shipping Schedule), N1 (Name), LIN (Item Identification Detail), REF (Reference Numbers), CTT (Transaction Totals), FST (Forecast Schedule). Each partner guide sets which segments and elements your account must send.

What is the difference between EDI 862 and EDI 830?

The 862 carries the shipping schedule and is used when specific shipment timing or quantities are scheduled. The 830 carries the demand and release schedule and is used when forecast or release planning is updated.

What should I map for X12 862?

Start with schedule reference, item and delivery time bucket and the target shipping schedule. Define duplicate detection, allowed updates and response correlation before mapping individual fields. Use the partner guide to check required fields and their formats.

How should I test 862 error handling?

Distinguish detailed shipping instructions from a longer-range forecast. Apply a revised delivery bucket without retaining superseded demand as extra demand. Also test a lost response after destination processing so that a retry cannot create an unintended duplicate or repeated adjustment.

Which partners list X12 862?

The directory on this page links 3 partner entries that list this message. Choose your partner and channel, then confirm which messages and versions your account requires.

Connect EDI to your business systems

See how Stacksync can fit your enterprise EDI workflow. Bring one partner guide and a sample exchange to plan the system mapping, exception handling and production rollout.