Skip to content

Stacksync × Supabase Miami: AI-Native OperationsOct 13Reserve your spot

X12 transaction code

EDI 876 Grocery Products Purchase Order Change (X12 876)

EDI 876 is the X12 Grocery Products Purchase Order Change transaction set, used when a grocery buyer revises an order. The grocery retailer or wholesaler that placed the original 875 sends the 876 to the supplier to modify that order.

Standard
X12
Code
876
Partner references
3

At a glance

EDI 876 at a glance

What the 876 carries, who sends it to whom, when it goes out, and the segments trading partners list for it.

X12 876 Grocery Products Purchase Order Change summary
Document X12 876 Grocery Products Purchase Order Change
Business record Grocery order change
Who sends it to whom The grocery retailer or wholesaler that placed the original 875 sends the 876 to the supplier to modify that order.
When it is sent A buyer revises a submitted grocery purchase order before fulfillment, for example a demand shift, an item cut, or a delivery date move, and transmits the revision as an 876.
Match on Original grocery order, revision and item
Partner references 3 trading partners in this directory
Related documents X12 875 Grocery Products Purchase Order, X12 880 Grocery Products Invoice

Key segments in an EDI 876

The business segments that appear in at least half of the 4 partner document references listed below, most common first. The table leaves out envelope segments (ISA, GS, ST, SE, GE, IEA). Your partner guide sets which segments and elements your account must send.

Segment Name Purpose Partner references
G92 Purchase Order Change Type To identify the reason for a change to a previously transmitted purchase order. 4 of 4
G62 Date/Time To specify pertinent dates and times. 4 of 4
NTE Note/Special Instruction To transmit information in a free-form format, if necessary, for comment or special instruction. 4 of 4
N1 Name To identify a party by type of organization, name, and code. 4 of 4
G68 Line Item Detail - Product To specify basic and most frequently used purchase order line item data. 4 of 4
G69 Line Item Detail - Description To describe an item in free-form format. 4 of 4
G70 Line Item Detail - Miscellaneous To provide for miscellaneous information relative to a line item. 4 of 4
G72 Allowance or Charge To specify allowances, charges, or services. 4 of 4
G76 Total Purchase Order To specify summary details of total items shipped in terms of quantity, weight, and volume, and to specify payment method. 4 of 4
N9 Extended Reference Information To transmit identifying information as specified by the Reference Identification Qualifier. 3 of 4

Stacksync connects EDI documents such as the X12 876 to your ERP, CRM and databases with two-way sync. Read the EDI overview, check pricing and security, or book a demo to walk through your partner guide.

Implementation guide

X12 876 mapping and validation

X12 876 Grocery Products Purchase Order Change is used when a grocery buyer revises an order. Preserve original grocery order, revision and item so the grocery order change in your business system stays connected to the original document.

Use the version and implementation guide agreed with your trading partner to confirm required fields and responses.

Map records and test the business result
Document or decisionRecord and matching IDsWhat to test
Match the business record grocery order change

original grocery order, revision and item

  • Define which combination of original grocery order, revision and item identifies one business record, its lines and any later revision.
Update the receiving system Processing the grocery order change

ID assigned by the receiving system and processing result

  • Apply a pack-quantity change to the original order line.
  • Test a late reduction after warehouse picking and require operational review.
Check the processing result Processing status for the grocery order change

Original document reference and matching response

  • Reconcile the grocery order change with the source after a timeout before sending it again. A lost response can occur after the destination has already processed the document.

How the related documents differ

Each message represents a different business event. Use shared references to connect the records while tracking each message’s outcome separately.

Implementation steps

  1. Choose the starting event and owner

    Decide which application acts when a grocery buyer revises an order. Name the operational owner of the grocery order change and the team that resolves rejected or ambiguous messages.

  2. Keep record IDs connected

    Map original grocery order, revision and item. Confirm qualifiers, code lists, units and date/time meaning against the agreed X12 version and partner guide. Preserve the source reference alongside any new destination identifier.

  3. Test failures before launch

    Run the failure cases in the mapping table against realistic grocery order change data. Check how the receiving system reports a rejection and how your team corrects it without creating a duplicate.

  4. Track every document to completion

    Record transport delivery and document validation separately from successful grocery order change processing. Give unresolved errors an owner and check the receiving system before approving retries.

Go-live checklist

  • An approved 876 sample and the agreed version and partner guide are available.
  • The mapping tests pass with realistic grocery order change data.
  • Each submitted document can be traced through delivery, validation and processing in the receiving system.
  • Your team knows how to investigate and recover a rejected or timed-out grocery order change without processing it twice.

Document structure

X12 876 Grocery Products Purchase Order Change at the element level

The X12 876 reference contains 24 segment entries and 80 data elements; 46 are marked mandatory in this reference. Use the version and partner guide agreed for your account to confirm required fields.

Segments
24
Data elements
80
Mandatory elements
46
Segments with elements marked mandatory in this reference
Segment Elements Mandatory
G92 3 3
N9 2 1
G61 4 2
NTE 2 1
G23 6 2
N1 4 1
N3 2 1
G68 9 2
G69 1 1
G72 3 2
G73 1 1
Key identifiers in 876
  • Change or Response Type Code
  • Date
  • Purchase Order Number
  • Reference Identification Qualifier
  • Contact Function Code
  • Name
  • Description
  • Terms Type Code

Catalog breakdown

Where X12 876 Grocery Products Purchase Order Change appears in this catalog

The largest groups of classified 876 catalog entries are in grocery & food.

By industry

  • grocery & food 4 channels

By network

  • SPS Commerce 2 channels

FAQ

EDI 876 questions

What is an EDI 876?

EDI 876 is the X12 Grocery Products Purchase Order Change transaction set. Trading partners use it when a grocery buyer revises an order. It carries the data for the grocery order change, and your system matches it on original grocery order, revision and item.

Who sends an EDI 876 and who receives it?

The grocery retailer or wholesaler that placed the original 875 sends the 876 to the supplier to modify that order. Your trading partner agreement confirms the direction and version for your account.

When is an EDI 876 sent?

A buyer revises a submitted grocery purchase order before fulfillment, for example a demand shift, an item cut, or a delivery date move, and transmits the revision as an 876. Your partner guide sets any deadline or schedule for the document.

What are the key segments in an EDI 876?

Across 4 partner document references listed here, the business segments that appear most often include G92 (Purchase Order Change Type), G62 (Date/Time), NTE (Note/Special Instruction), N1 (Name), G68 (Line Item Detail - Product), G69 (Line Item Detail - Description). Each partner guide sets which segments and elements your account must send.

What is the difference between EDI 876 and EDI 875?

The 876 carries the grocery order change and is used when a grocery buyer revises an order. The 875 carries the grocery purchase order and is used when a grocery buyer places an order.

What should I map for X12 876?

Start with original grocery order, revision and item and the target grocery order change. Define duplicate detection, allowed updates and response correlation before mapping individual fields. Use the partner guide to check required fields and their formats.

How should I test 876 error handling?

Apply a pack-quantity change to the original order line. Test a late reduction after warehouse picking and require operational review. Also test a lost response after destination processing so that a retry cannot create an unintended duplicate or repeated adjustment.

Which partners list X12 876?

The directory on this page links 3 partner entries that list this message. Choose your partner and channel, then confirm which messages and versions your account requires.

Connect EDI to your business systems

See how Stacksync can fit your enterprise EDI workflow. Bring one partner guide and a sample exchange to plan the system mapping, exception handling and production rollout.