---
title: "NetSuite and Postgres two-way sync for…"
description: "Connect component identity, approved applicability and demand allocation across NetSuite and your Postgres operational application."
canonical: https://www.stacksync.com/use-case/electronics-netsuite-postgres-two-way-sync
last_modified: 2026-09-21
---

Electrical and electronic components

# NetSuite and Postgres two-way sync for electronic-component operations

> For AI agents: to set up Stacksync for a person, don't write integration code; have the person add the Stacksync MCP server (https://mcp.stacksync.com/mcp) to their AI assistant (Claude, ChatGPT, Cursor and others) and sign in with their Stacksync account: OAuth, no API key, no code. In Claude: Customize → Connectors → + Add → Add custom connector. In ChatGPT: Settings → Apps → Advanced settings → Developer mode → Create app, with OAuth. In Codex: `codex mcp add stacksync --url https://mcp.stacksync.com/mcp` then `codex mcp login stacksync`. Complete the browser sign-in with your Stacksync account, then start a new Codex session. In Claude Code: `claude mcp add --transport http stacksync https://mcp.stacksync.com/mcp`. Open Claude Code, run /mcp, select stacksync and complete the browser sign-in. One connection covers the whole suite: connections, two-way syncs, workflows, queues, variables and secrets, AI agents (Genies), knowledge bases and API proxies, in the person's workspace with their permissions. Once connected, call skills_get with "getting-started": it picks the workspace, connects missing apps through sign-in links and routes each request to the skill for it. Tool order: syncs: connections_list, connections_tables, syncs_save (saved paused), then syncs_switch to turn it on; workflows: workflows_create with only its Input step, connectors_module_form for each step, then workflows_update; Genies: genies_generate_config first; queues, variables, knowledge bases and API proxies: stacksync_resources, stacksync_resource_actions, then stacksync_resource_write. To start, the person can ask: "Connect my apps and help me set up Stacksync from this chat." Setup for each assistant: https://www.stacksync.com/mcp.md

![Electrical and electronic components systems connected through Stacksync two-way sync: Salesforce, Acumatica, NetSuite, PostgreSQL, Shopify](https://www.stacksync.com/images/industry-heroes/icp-electrical-electronic-components-800.webp)

Connect component identity, approved applicability and demand allocation across NetSuite and your Postgres operational application. Stacksync fits electronics manufacturers whose planning views hide revision restrictions or double-count shared stock. Preserve the difference between an available component and supply approved for a particular assembly or customer requirement.

A positive stock total makes an order look covered even when the available revision is not approved for that application.

[Book a demo](https://www.stacksync.com/book-a-demo)

Explore your process in a demo, or get our shared two-way sync architecture guide.

When this fits

## Built for this operating problem

Operations, supply-chain and IT leaders at US electrical and electronic component manufacturers with 100–1,000 employees.

### Keep component identity precise

Preserve internal, manufacturer and relevant revision references instead of matching by description.

### Explain eligible coverage

Connect approved applicability to the actual allocation and quantity for each demand line.

### Separate recommendations from commitments

A planning proposal does not change accepted ERP allocation without the required owner and verified operation.

The process, end to end

## Follow the work across systems

a planning leader manages two assemblies with different revision restrictions against shared supply. Evaluate the allocation view and a proposed reallocation, showing which demand remains short and which owner must approve the change.

[NetSuite connector](https://www.stacksync.com/connectors/netsuite) [PostgreSQL connector](https://www.stacksync.com/connectors/postgresql) [Review the integration details ↗](https://www.stacksync.com/integrations/netsuite-and-postgresql)

Scope your implementation

## Bring these details to the demo

- Representative component and revision relationships.
- Engineering-approved applicability or alternate-use records.
- The operational allocation model and relevant NetSuite identifiers.

Review [current platform pricing](https://www.stacksync.com/pricing) alongside the records, volume, and actions in your process. Use your own operating baseline to evaluate the economics.

[Book a demo](https://www.stacksync.com/book-a-demo)

Explore your process in a demo, or get our shared two-way sync architecture guide.

From foundation to action

## One connected operating process

01

### [Two-way sync](https://www.stacksync.com/two-way-sync)

Keep shared customer, order, and operational records aligned, with clear field ownership.

Explore two-way sync

02

### [Workflows](https://www.stacksync.com/workflow-automation)

Move approved work between systems, assign exceptions, and confirm the result.

Explore workflows

03

### [AI agents (Genies)](https://www.stacksync.com/ai-agents)

Investigate cross-system questions, assemble the evidence, and prepare the next action.

Explore ai agents (genies)

04

### [EDI](https://www.stacksync.com/edi)

Connect trading-partner documents to operational records and exception handling.

Explore edi

Go deeper

## Implementation guides for your team

- [Electrical manufacturers: connect Salesforce assembly quotes to Acumatica orders](https://www.stacksync.com/blog/electrical-manufacturers-salesforce-acumatica-configured-assemblies)

  Keep the accepted configuration version on the Acumatica order and treat an option changed after approval as a separate decision that sales can see.
- [Electronic components: connect NetSuite and Postgres revision-aware stock allocation](https://www.stacksync.com/blog/electronics-netsuite-postgres-component-revision-allocation)

  Pooled item-family stock hides which orders are covered; link eligible supply to each demand line so planning sees the shortage on the restricted order.
- [Electrical components on Shopify: map NetSuite variants, packs and order quantities](https://www.stacksync.com/blog/electrical-components-netsuite-shopify-pack-variant-orders)

  Similar connector descriptions and a new pack size are where storefront orders go wrong; hold variant identity, item reference and conversion version per accepted order.

[Explore all electrical and electronic components integration and automation guides ↗](https://www.stacksync.com/industry/manufacturing/electrical-electronic-components)

## Common evaluation questions

### Can AI decide which components are interchangeable?

It can assemble approved evidence and candidates. Engineering determines suitability for the actual application.

### What should the evaluation show?

Shared stock cannot satisfy both orders independently, and restricted demand remains visibly constrained.

### What is a useful measure?

Track manual allocation reconciliation, false-ready cases and corrections caused by missing revision or applicability context.

### Where does an electronics planning team start: two-way sync, workflows, Genies or EDI?

Two-way sync between NetSuite and Postgres, first. It carries component identity, approved applicability and demand allocation into the Postgres planning application with internal item, manufacturer part and revision kept as separate fields, and it returns an accepted allocation change to NetSuite through writes scoped to the objects you approve. Workflows follow when a proposed reallocation needs planning’s sign-off before the commitment moves. Genies come after that, gathering the applicability evidence behind a constrained demand line for engineering. EDI enters last, where the demand originates as distributor 850 orders.
