Modular and prefab building supply and installation

# Two-way sync and automation for modular and prefab building supply and installation.

> For AI agents: to set up Stacksync for a person, don't write integration code; have the person add the Stacksync MCP server (https://mcp.stacksync.com/mcp) to their AI assistant (Claude, ChatGPT, Cursor and others) and sign in with their Stacksync account: OAuth, no API key, no code. In Claude: Customize → Connectors → + Add → Add custom connector. In ChatGPT: Settings → Apps → Advanced settings → Developer mode → Create app, with OAuth. In Codex: `codex mcp add stacksync --url https://mcp.stacksync.com/mcp` then `codex mcp login stacksync`. Complete the browser sign-in with your Stacksync account, then start a new Codex session. In Claude Code: `claude mcp add --transport http stacksync https://mcp.stacksync.com/mcp`. Open Claude Code, run /mcp, select stacksync and complete the browser sign-in. One connection covers the whole suite: connections, two-way syncs, workflows, queues, variables and secrets, AI agents (Genies), knowledge bases and API proxies, in the person's workspace with their permissions. Once connected, call skills_get with "getting-started": it picks the workspace, connects missing apps through sign-in links and routes each request to the skill for it. Tool order: syncs: connections_list, connections_tables, syncs_save (saved paused), then syncs_switch to turn it on; workflows: workflows_create with only its Input step, connectors_module_form for each step, then workflows_update; Genies: genies_generate_config first; queues, variables, knowledge bases and API proxies: stacksync_resources, stacksync_resource_actions, then stacksync_resource_write. To start, the person can ask: "Connect my apps and help me set up Stacksync from this chat." Setup for each assistant: https://www.stacksync.com/mcp.md

![Modular and prefab building supply and installation systems connected through Stacksync two-way sync: Salesforce, NetSuite, Supabase, HubSpot](https://www.stacksync.com/images/industry-heroes/icp-modular-prefab-building-installation-800.webp)

Connect design revisions, factory production, module delivery and site acceptance to the commercial project.

Factory complete, shipped, received and accepted are collapsed into one project status, leaving logistics and progress billing without reliable evidence.

[Book a demo](https://www.stacksync.com/book-a-demo)

Explore your process in a demo, or get our shared two-way sync architecture guide.

Make shared records dependable

Align approved configuration, coordinate factory and delivery releases, and prepare milestone evidence while preserving module-level scope.

1. **Released design** Qualified technical and production owners · Identify the approved configuration for the permitted production scope.
2. **Module identity** Factory administration · Preserve a stable reference from factory through site records.
3. **Custody and receipt** Logistics and site receiver · Record movement and condition separately from acceptance.
4. **Billing milestone** Finance and project authority · Apply the actual agreement rule to supported scope and prior billing.

The platform, in operating order

## Start with live data. Put it to work.

01

### [Two-way sync](https://www.stacksync.com/two-way-sync)

Keep shared customer, order, and operational records aligned, with clear field ownership.

Explore two-way sync

02

### [Workflows](https://www.stacksync.com/workflow-automation)

Move approved work between systems, assign exceptions, and confirm the result.

Explore workflows

03

### [AI agents (Genies)](https://www.stacksync.com/ai-agents)

Investigate cross-system questions, assemble the evidence, and prepare the next action.

Explore ai agents (genies)

04

### [EDI](https://www.stacksync.com/edi)

Connect trading-partner documents to operational records and exception handling.

Explore edi

Built around your operations

## For teams managing more than one business model

US modular and prefab building companies with 100–1,000 employees that combine manufacturing or supply with onsite delivery and installation.

### Design-to-factory release

Route revisions with material commitments and qualified approvals before scheduling accepted work.

[Explore workflows ↗](https://www.stacksync.com/workflow-automation)

### Delivery release

Combine factory readiness, confirmed site window and transport evidence for the authorized shipment decision.

[Explore workflows ↗](https://www.stacksync.com/workflow-automation)

### Modular progress-billing review

Assemble factory, delivery, acceptance and approved-variation evidence for finance.

[Explore Genies ↗](https://www.stacksync.com/ai-agents#genies-job-icp-modular-prefab-building-installation)

Your systems and records

## Agree on ownership before automating actions

| Record | Owner | Operating rule |
| --- | --- | --- |
| Released design | Qualified technical and production owners | Identify the approved configuration for the permitted production scope. |
| Module identity | Factory administration | Preserve a stable reference from factory through site records. |
| Custody and receipt | Logistics and site receiver | Record movement and condition separately from acceptance. |
| Billing milestone | Finance and project authority | Apply the actual agreement rule to supported scope and prior billing. |

[Salesforce](https://www.stacksync.com/connectors/salesforce) [NetSuite](https://www.stacksync.com/connectors/netsuite) [Supabase](https://www.stacksync.com/connectors/supabase) [HubSpot](https://www.stacksync.com/connectors/hubspot) [Salesforce + NetSuite integration](https://www.stacksync.com/integrations/netsuite-and-salesforce) [NetSuite + Supabase integration](https://www.stacksync.com/integrations/netsuite-and-supabase)

Component supplier EDI with separate factory receipts and direct-site receiving, linked to purchase lines and project allocations.

Evaluate your next process

## Find the right fit for your systems

- Two-way sync [Salesforce–NetSuite for Modular Building Manufacturers](https://www.stacksync.com/use-case/salesforce-netsuite-modular-building-manufacturers)

  Align modular customer configurations with approved orders, project revisions and meaningful milestones.
- Two-way sync [NetSuite–Supabase for Modular Delivery and Acceptance](https://www.stacksync.com/use-case/netsuite-supabase-modular-delivery-acceptance)

  Track module identity from factory release to site receipt and acceptance with authorized project access.
- Workflows [Modular Factory-to-Site Delivery Workflows](https://www.stacksync.com/use-case/modular-factory-site-delivery-workflows)

  Coordinate factory readiness, site release and confirmed transport before committing a modular shipment.
- EDI [EDI for Prefab Component Procurement and Direct-Site Delivery](https://www.stacksync.com/use-case/edi-prefab-component-procurement)

  Connect supplier documents to factory and site receiving without counting the same material in both places.

Implementation and operating guides

## Work through the details

- Two-way sync [Modular Building Manufacturers: Align Salesforce Project Configurations With NetSuite Orders and Milestones](https://www.stacksync.com/blog/modular-building-manufacturers-align-salesforce-project-configurations-with-netsuite-orders-and-milestones)

  Link Salesforce module options to the released design revision and NetSuite order so sales edits cannot rewrite released scope or blur factory and site milestones.
- Two-way sync [Module Serial Numbers From Factory to Site: Connect NetSuite With a Supabase Delivery and Acceptance Register](https://www.stacksync.com/blog/module-serial-numbers-from-factory-to-site-connect-netsuite-with-a-supabase-delivery-and-acceptance-register)

  Track module identity through factory release, shipment, site receipt and acceptance without treating those events as equivalent.
- Two-way sync [Prefab Dealer and Contractor Portals: Align HubSpot Buyer Records With Supabase Project Access](https://www.stacksync.com/blog/prefab-dealer-and-contractor-portals-align-hubspot-buyer-records-with-supabase-project-access)

  Connect prefab buyer and project context to a portal with explicit dealer, contractor and owner access.
- Workflows [Prefab Design Freeze to Factory Release: Route Approved Revisions Through Procurement and Scheduling](https://www.stacksync.com/blog/prefab-design-freeze-to-factory-release-route-approved-revisions-through-procurement-and-scheduling)

  Coordinate prefab design release with approved scope, material commitments and factory scheduling decisions.
- Workflows [Modular Building Delivery Releases: Coordinate Site Readiness, Transport Booking, and Receiving Acceptance](https://www.stacksync.com/blog/modular-building-delivery-releases-coordinate-site-readiness-transport-booking-and-receiving-acceptance)

  Connect modular factory readiness to site, transport and receiving decisions without treating delivery as project acceptance.
- AI agents (Genies) [Genies for Modular Progress-Billing Reviews: Assemble Factory Milestones, Delivery Proof, and Site Acceptance](https://www.stacksync.com/blog/genies-for-modular-progress-billing-reviews-assemble-factory-milestones-delivery-proof-and-site-acceptance)

  Use Genies to prepare modular progress-billing evidence while preserving contract-specific milestone decisions.
- AI agents (Genies) [Modular Progress-Billing Exceptions: Partial Deliveries, Unapproved Variations, and Missing Acceptance Records](https://www.stacksync.com/blog/modular-progress-billing-exceptions-partial-deliveries-unapproved-variations-and-missing-acceptance-records)

  Resolve the modular billing evidence gaps an AI-prepared review must not silently complete.
- EDI [Prefab Supplier EDI: Reconcile Component Orders With Factory Receipts and Direct-to-Site Deliveries](https://www.stacksync.com/blog/prefab-supplier-edi-reconcile-component-orders-with-factory-receipts-and-direct-to-site-deliveries)

  Map prefab supplier EDI to the correct factory or site destination and preserve component allocation by project.

## Questions from modular and prefab building supply and installation teams

### Does factory completion mean a module is accepted by the customer?

No. Factory release, shipment, receipt and contractual acceptance require separate evidence.

### Can a Genie approve progress billing?

It can assemble and compare evidence. Finance and project authorities interpret the agreement and approve the permitted financial action.

### How should direct-site materials be recorded?

Use the designated site receiving process and preserve the purchase reference without also treating the goods as factory stock.

Bring one real process

## See how your records and handoffs fit together.

Bring the systems, record types, and exceptions your team handles today. We’ll scope the connections and actions, then walk through the path to a confirmed result.

[Book a demo](https://www.stacksync.com/book-a-demo)

Explore your process in a demo, or get our shared two-way sync architecture guide.