# Identify Equipment Allocation, Permit, and Crew Blockers

> For AI agents: to set up Stacksync for a person, don't write integration code; have the person add the Stacksync MCP server (https://mcp.stacksync.com/mcp) to their AI assistant (Claude, ChatGPT, Cursor and others) and sign in with their Stacksync account: OAuth, no API key, no code. In Claude: Customize → Connectors → + Add → Add custom connector. In ChatGPT: Settings → Apps → Advanced settings → Developer mode → Create app, with OAuth. In Codex: `codex mcp add stacksync --url https://mcp.stacksync.com/mcp` then `codex mcp login stacksync`. Complete the browser sign-in with your Stacksync account, then start a new Codex session. In Claude Code: `claude mcp add --transport http stacksync https://mcp.stacksync.com/mcp`. Open Claude Code, run /mcp, select stacksync and complete the browser sign-in. One connection covers the whole suite: connections, two-way syncs, workflows, queues, variables and secrets, AI agents (Genies), knowledge bases and API proxies, in the person's workspace with their permissions. Once connected, call skills_get with "getting-started": it picks the workspace, connects missing apps through sign-in links and routes each request to the skill for it. Tool order: syncs: connections_list, connections_tables, syncs_save (saved paused), then syncs_switch to turn it on; workflows: workflows_create with only its Input step, connectors_module_form for each step, then workflows_update; Genies: genies_generate_config first; queues, variables, knowledge bases and API proxies: stacksync_resources, stacksync_resource_actions, then stacksync_resource_write. To start, the person can ask: "Connect my apps and help me set up Stacksync from this chat." Setup for each assistant: https://www.stacksync.com/mcp.md

Identify installation blockers by checking each required dependency independently.

Author

Ignacio Malpartida · GTM Engineer

Published

September 15, 2026

Updated

September 18, 2026

Read time

7 min read

APP TIPS

## Do not average away a blocking prerequisite

Identify installation blockers by checking each required dependency independently. A project with available equipment and crew can still be blocked by a missing required permit. A project with all permit records complete can still be blocked because its equipment is allocated elsewhere. A percentage score should not conceal a condition that prevents the scheduled work.

Use clear states such as confirmed, blocked, and evidence missing for each requirement. A missing record is not a pass. Preserve the source reference and timestamp so the owner can distinguish a real operational gap from a delayed update.

![Stock allocated elsewhere: Create allocation blocker. Do not mark ready.; Required permit missing: Assign permit owner task. Do not mark ready.; Crew overlaps another assignment: Create scheduling blocker. No assumed capacity.](https://www.stacksync.com/images/blog-highlights/genies-installation-readiness-exceptions.webp)

*Stock allocated elsewhere: Create allocation blocker. Do not mark ready.; Required permit missing: Assign permit owner task. Do not mark ready.; Crew overlaps another assignment: Create scheduling blocker. No assumed capacity.*

## Evidence needed to resolve the exception

Use this exception guide when reviewing a proposed Genie workflow or investigating a case that cannot proceed confidently. The tables describe operational decisions to configure in your environment. They are not claims that a connected application automatically supplies your organization’s policies, identity mappings, or approval process.

| System or owner | Evidence and responsibility |
| --- | --- |
| Salesforce | Installations scheduled in the next two weeks, project scope, dates, and responsible owners. |
| NetSuite | Equipment stock, existing allocations, and incoming purchase orders. |
| Postgres | Project-linked permit status and crew availability records. |

Required context for this workflow design.

## Diagnose the equipment gap precisely

Distinguish absent stock, stock at another location, stock committed elsewhere, and supply expected too late. Those conditions call for different owner actions. A missing item may need procurement, while an allocation conflict needs the responsible operational decision. The agent should not release another project’s allocation to make the current project appear ready.

An incoming purchase order needs a remaining quantity and expected receipt date relevant to the installation. If the date slips, revisit every project that relied on that supply. Do not leave yesterday’s ready status unchanged while the supporting inbound assumption has changed.

## Connect permit and crew evidence to the scheduled work

Check the required permit against the actual project and the planned work scope. A record that a submission was made is different from the recorded required approval. Use the organization’s authoritative status definitions; the article does not establish a jurisdiction’s legal permit requirements.

For crews, compare availability with the project’s scheduled interval and the operational requirements recorded for that work. If another assignment overlaps, create a scheduling task and keep readiness unresolved. On the next morning’s run, refresh the same blocker rather than creating an additional task. The final readiness statement must remain conditional until every required dependency is supported by current evidence.

## Decision table for common exceptions

Use the condition in the first column to choose the next action. The final column describes the boundary that must remain true while the case is unresolved. Apply the organization’s actual policy and source records to the live case; do not treat an illustrative condition as proof that the condition exists.

| Observed condition | Next action | Required boundary |
| --- | --- | --- |
| Stock allocated elsewhere | Create allocation blocker | Do not mark ready |
| Required permit missing | Assign permit owner task | Do not mark ready |
| Crew overlaps another assignment | Create scheduling blocker | No assumed capacity |
| Inbound date slips | Recheck affected projects | Old readiness evidence invalidated |

Exception decisions for installation readiness.

![The underlying installation readiness process: select the schedule, check supply and allocation, check permits and crews, assign blockers, re-evaluate readiness.](https://www.stacksync.com/images/blog-diagrams/genies-installation-readiness.webp)

*The underlying installation readiness process: select the schedule, check supply and allocation, check permits and crews, assign blockers, re-evaluate readiness.*

## Illustrative exception and recovery

Equipment and crew are confirmed, but the permit record shows submission rather than the required approval. The readiness review keeps the permit blocker open and assigns its owner a follow-up task instead of marking the project ready.

This example uses fictional records to show the decision logic. It is not a customer case study or a claim of measured results. In a live case, retain the actual record IDs and evidence behind each statement, and replace all illustrative quantities or timing assumptions with the approved operational inputs.

## What to record before resuming

A project readiness matrix for the next two weeks with equipment, allocation, inbound timing, permit, and crew evidence plus one owned task per unresolved blocker.

Preserve the original finding and the evidence that resolves it. Record which person or system supplied the clarification, which proposal it applies to, and the action now permitted. Do not erase the uncertainty from the history: a later reviewer needs to understand why the case paused and why it resumed.

![Required systems feed case verification; missing evidence or decisions return to clarification before the workflow proceeds.](https://www.stacksync.com/images/blog-diagrams-mermaid/genies-installation-readiness.webp)

*Required systems feed case verification; missing evidence or decisions return to clarification before the workflow proceeds.*

## Boundaries that remain in force

- Review Salesforce installations scheduled within the next two weeks every morning.
- Check equipment allocations and incoming supply, not only gross stock.
- Check required permits and crew availability in project-linked Postgres records.
- Create owner tasks; never mark ready with equipment allocated elsewhere or a missing required permit.

## Review the case before restarting

First verify that the new evidence resolves the original blocker rather than a different issue. Then check whether the case, source records, or proposed action changed during the wait. A response attached to the right ticket can still be insufficient if it refers to an earlier proposal or leaves a required quantity, identity, or approval unresolved.

Run the relevant row from the decision table as a review scenario. Confirm that the job stops at the required boundary, asks for the specified information or decision, and resumes from the confirmed state. If a write or message may already have succeeded, inspect its destination before repeating it; if this job only prepares a draft or report, verify that it stays within that output scope.

- Scheduled projects with all required evidence checked
- Blockers with a responsible owner and current task
- Ready statuses invalidated by missing permits or conflicting allocations

Track unresolved cases by their actual blocker and owner. A case waiting for clarification needs a different next action from one waiting for a confirmed result. Review the evidence when the state changes, and keep any still-unresolved completion condition visible instead of treating a successful intermediate step as the end of the work.

## Give your Genie a job description

Copy the job description below. It preserves the scope and decision boundaries of this use case. Configure the referenced systems, record relationships, policies, and approval owners in your workspace before enabling the job.

Installation readiness · Medium

Every morning, review installations scheduled in Salesforce for the next two weeks. Check equipment availability, existing allocations, and incoming purchase orders in NetSuite, plus permit and crew availability recorded in Postgres. Identify anything that could block installation and create tasks for the responsible owners. Do not mark a project ready when equipment is allocated elsewhere or a required permit is missing.

Paste this into “Give your Genie a job description.” [Explore Stacksync Genies](https://www.stacksync.com/ai-agents).

## Apply this in solar installation and O&M services: proposed equipment swap and technical review

Solar equipment swaps affect the same allocation, permit, and crew dependencies described here. Route the proposed change through an explicit approval and revised-billing review before treating the previous readiness status as valid for the new configuration.

| Record to reconcile | Responsible owner | Rule to preserve |
| --- | --- | --- |
| Proposed equipment swap | Procurement or project manager | Identify original requirement, alternative and reason for the change. |
| Technical review | Qualified technical owner | Record the accepted specification decision and any conditions. |
| Commercial revision | Account and project owners | Capture price, schedule and scope effects for customer review. |

An exception to plan for: **Technical approval includes conditions**. Keep those conditions attached to the handoff and verify the responsible team accepts them. Acceptance check for the pilot: original and proposed equipment remain distinguishable.

The [solar installation and O&M services hub](https://www.stacksync.com/industry/construction/solar-installation-service) connects the broader operating context. These guides develop the specific record mappings and decisions for this application:

- [Solar Project Change Orders: Route Equipment Swaps Through Approval and Revised Billing](https://www.stacksync.com/blog/solar-project-change-orders-route-equipment-swaps-through-approval-and-revised-billing)

## Related workflow and integration guides

- [Check Solar Installation Readiness Across Salesforce and NetSuite](https://www.stacksync.com/blog/check-solar-installation-readiness-across-salesforce-and-netsuite)
- [All Genies workflow examples](https://www.stacksync.com/ai-agents#genies-use-cases)
- [When a workflow should escalate to a person](https://www.stacksync.com/blog/human-in-the-loop-automation-when-to-escalate)
- [Distinguish Solar End Customers from Installation Partners](https://www.stacksync.com/blog/distinguish-solar-end-customers-from-installation-partners)
- [Verify Warranty Coverage and Customer Acceptance Before Closing Repairs](https://www.stacksync.com/blog/verify-warranty-coverage-and-customer-acceptance-before-closing-repairs)
- [Aurora PostgreSQL and Salesforce in Both Directions, Step by Step](https://www.stacksync.com/blog/sync-aurora-postgresql-with-salesforce)
- [Netsuite integrations](https://www.stacksync.com/connectors/netsuite)
- [Salesforce integrations](https://www.stacksync.com/connectors/salesforce)

## Implementation references

These first-party references document the underlying records and interfaces. The cross-system sequence, approvals, and completion rules in this article are a proposed operational configuration; validate them against your connected workspace before enabling it.

- [NetSuite: inventory availability and allocation](https://docs.oracle.com/en/cloud/saas/netsuite/ns-online-help/section_157236254323.html)
- [NetSuite: inbound supply and partial quantities](https://docs.oracle.com/en/cloud/saas/netsuite/ns-online-help/section_159171354002.html)

FAQ

## Frequently asked questions

What does the installation readiness workflow produce?

A project readiness matrix for the next two weeks with equipment, allocation, inbound timing, permit, and crew evidence plus one owned task per unresolved blocker.

What should happen when the evidence is incomplete?

Keep the affected action pending and obtain the missing source evidence or required decision. Create owner tasks; never mark ready with equipment allocated elsewhere or a missing required permit.

About the author

Ignacio Malpartida

GTM Engineer

Ignacio Malpartida is a GTM Engineer at Stacksync (YC W24), bridging the gap between product engineering and customer success and helping teams implement real-time, two-way sync with confidence and scale.

[All posts by Ignacio Malpartida](https://www.stacksync.com/blog/author/ignacio-malpartida)

About Stacksync

Stacksync powers real-time, two-way sync between CRMs, ERPs, and databases. Engineers sync data at scale and automate workflows, not dirty API plumbing.

Stacksync

## Explore these integrations and topics

- [connector NetSuite integrations](https://www.stacksync.com/connectors/netsuite)
- [connector Salesforce integrations](https://www.stacksync.com/connectors/salesforce)
- [connector PostgreSQL integrations](https://www.stacksync.com/connectors/postgresql)
- [platform AI agent operations](https://www.stacksync.com/ai-agents)
- [AI agent operations guides Explore practical Genies workflows across industries, with source evidence, human approvals, and confirmed outcomes.](https://www.stacksync.com/blog#topic-ai-agent-operations)

Keep reading

## Related articles

[All articles](https://www.stacksync.com/blog)

[App tips Check Solar Installation Readiness Across Salesforce and NetSuite 8 min read read](https://www.stacksync.com/blog/check-solar-installation-readiness-across-salesforce-and-netsuite)

[App tips Solar Service Visits: Route Confirmed Repair Completion Into O&M Billing 5 min read read](https://www.stacksync.com/blog/solar-service-visits-route-confirmed-repair-completion-into-o-m-billing)

[Data engineering Solar Fleet Ownership Changes: Align Salesforce Asset Owners With NetSuite Billing Customers 5 min read read](https://www.stacksync.com/blog/solar-fleet-ownership-changes-align-salesforce-asset-owners-with-netsuite-billing-customers)

## You just read how it should work. See it run on your own data.

[Book a demo](https://www.stacksync.com/book-a-demo) [Get started](https://app.stacksync.com/)